Site Visit Report
I visited the Tribal Empowerment Public School (TEP), Laingangsing, Litan, Ukhrul District, Manipur on 1st & 2nd May 2019. I met all teachers there, discussed about the school. The day of my visit I experienced heavy showers of rain. Force of rain water-flow damaged many things in the area. Erosion and Landslide is a serious problem which damaging the school ground. Many students could not come to school because of heavy rains.
The school need repairing support. Also, Action to control landslide/ erosion must be taken on a priority. The classes have no partition walls in between, so partition wall essential.

  1. Number of Students by grade:

    Grade

    Girls

    Boys

    Total

    Nursery

    46

    40

    86

    KG

    35

    34

    69

    I

    18

    19

    37

    II

    20

    22

    42

    III

    40

    20

    60

    IV

    35

    26

    61

    V

    23

    39

    62

    VI

    21

    16

    37

    VII

    22

    10

    32

    Total

    260

    226

    486


  2. Number of teachers by subjects taught:

Total number of teachers is 10. Some teachers taught two subjects.

Grade

Subject

No of teachers

Nursery to II


English

1

III to V

 

1

VI to VII

 

1

Nursery to II


Maths

1

III to V

 

1

VI to VII

 

1

IV to V

Science

1

VI to VII

 

1

II to III


Social Studies

1

IV to V

 

1

VI to VII

 

1

I to VII

Hindi

1

IV to VII

General Knowledge

1

I to III


Moral Science

1

IV to V

 

1

VI to VII

 

1

I to III

MIL (Manipuri)

1

IV to VII

 

1

IV to VII

Conversation

1



  1. Physical condition of the building and areas of repairing:


The physical condition of the building is very poor. The wall of one building is made of by aluminium sheet and bamboo. The length of this building is 95 feet and breath is 18 feet. One building is partially made of by concrete and bamboo. The length of this building is 90 feet and breath is 19 feet. The roofs are also made of by aluminium sheet. Some Pillars are made of by wood and some are concrete. The walls are now damage and necessary to repair and it is better to construct by concrete. Toilet is also necessary to repair.

  1. Comments on the quality of material being taught:


There is very small amount of TLM. Though the quality of TML is good but it is not sufficient. So TML is necessary for every class.

  1. Graduation and results of the examinations (2018):


Graduation

Result

No of students


Nursery

A

21

 

B

38

 

C

10

 

D

0


KG

A

17

 

B

14

 

C

6

 

D

0


I

A

17

 

B

19

 

C

6

 

D

0


II

A

20

 

B

23

 

C

17

 

D

0


III

A

28

 

B

26

 

C

7

 

D

0


IV

A

21

 

B

33

 

C

8

 

D

0

V

A

17

 

B

11

 

C

9

 

D

0

VI

A

18

 

B

9

 

C

5

 

D

0

VII

A

16

 

B

11

 

C

7

 

D

0


% of marks: >80= A, 79 – 60= B, 59 – 40= C, >40= D (Fail)

  1. Infrastructures:
  2. Electricity: There is electricity connection,
  3. Drinking water: Natural water is collected and stores it. But there is no filtering system. So in the rainy season water become dirty. Provision of filtering is very essential.
  4. Options for increasing Computerization: There is no computerization in the school. The present school building is not suitable for computerization. But Computer subject is needed to be taught. So increasing computerization is essential.


  1. Any other comments or remarks or concern that would help us assess current performance or future prospects:


  1. The play ground is necessary to repair. Filling up of land is immediate necessity. A good play ground will help the student for physical exercise.
  2. In every year landslide is happening. It is dangerous for the students. So concrete boundary wall is necessary. The approximate length of the boundary wall is 600 feet and breath is 500 feet.
  3. There is no play material in the school. So volley ball, foot ball, skipping rope etc.
  4. There is no play material for primary students.
  5. Some furniture e,g Almirah, table, chair, White board is essential.


N.B: The cost of building materials are very high compare to the other market.